Operations have resumed at Kansai Electric Power Co.’s 900-Megawatt (MW) No.2 unit. The Japanese utility idled the unit after a material handling system suffered damage from the fire. Kepco said it needed to restart the unit to prevent another possible fire from igniting in the storage bunker.

Share