The project will transition Trimble County Generating Station’s CCR processing from a wet system to a state-of-the-art closed-pipe dry conveyor system to convey bulk materials. Closed-pipe conveyors typically used for conveying bulk materials such as flyash and gypsum, as at this site, for long distances where space is an issue and steep inclines are necessary.